BMW M4

xDrive Competition M 2dr Step Auto Petrol Coupe

Overview

Insurance group

Fuel type

Petrol

Body type

Coupe

Transmission

Automatic

Boot space

Seats

4

Colour

Metallic - Isle of Man green

Performance

Engine power

510 bhp

Top speed

155 mph

What's Included?
  • Electric Bootlid£0.00
  • Comfort Access£0.00
  • Adaptive LED Headlights£0.00
  • High-Beam Assistant£0.00
  • Driving Assistant£0.00
  • M Brakes with Red Calipers£325.00
  • Silverstone and Black Bicolour Extended Merino Leather£325.00
  • Paint: Isle of Man Green£875.00
  • Carbon Fibre Interior Trim£1200.00
  • Technology Pack£3025.00

Please note that these are factory fitted options which have been added to your vehicle and are included in the price.

Interior Features
  • 12V power socket in front centre console with blanking plug
  • Carbon fibre centre console incl. cover for cupholders
  • 12V socket in luggage compartment
  • 2 x USB Type C ports for charging in rear centre console
  • Front door armrests
  • Anthracite headlining
Exterior Features
  • Body colour door handles
  • Body colour bumpers
  • Rear reflectors
  • Shark fin roof aerial
  • Black model designation badges
  • Visible VIN plate

BMW M4

xDrive Competition M 2dr Step Auto Petrol Coupe

BMW York
4.3

Every effort has been made to ensure the accuracy of the information shown. However, errors do sometimes occur. The specification of each vehicle listed on the Vertu website is provided by "CAP". Please note that the Images of each vehicle are range shots, these can include images which do not reflect the precise details of the vehicle you are looking at and are purely used for illustrative purposes. The inclusion of such data does not imply any endorsement of any of its content nor any representation as to its accuracy. We do not charge a fee for introduction to a finance provider; however we may or may not receive a commission.

*The information given about models and their specification and features applies at the time that a vehicle is listed online or when the listing has been updated. Specifications and features do change and the information is given only as a guide. It may contain errors or omissions. The actual specification of a vehicle at the time of purchase may differ from that listed above and any important feature should be clarified as part of your purchase. The information above does not constitute an offer to sell.

For full terms and conditions visit the Vertu Terms and Conditions page.