Bristol Street Motors is now Vertu!

Still the same great team and service - online, on the phone and in our dealerships.

We no longer support this web browser. Upgrade your browser for a better experience.

Fuel type
Petrol
Transmission
Automatic
Body style
Coupe
Seats
4
Road Tax
£4850
Insurance

All cars are categorised into one of 50 insurance groups. The insurance group of a vehicle increases with its power. Vehicles in lower groups are cheaper to insure than those higher up. Learn more.

42E
Co2

A vehicle's CO2 emissions are calculated through a series of tests and measured in g/km. The lower the unit, the better it is for the environment, and the less road tax you will pay.

229
Fuel economy

Mpg stands for miles per gallon, and is used to show how far your car is able to travel for every gallon (or 4.55 litres) of fuel it uses. The combined WLTP fuel economy figure provides a general overview of a car's fuel consumption over a variety of speeds and road types.

28 mpg

What's included?

Electric Bootlid £0.00
Comfort Access £0.00
Adaptive LED Headlights £0.00
High-Beam Assistant £0.00
Driving Assistant £0.00
Black Sapphire £0.00
Silverstone and Black Bicolour Extended Merino Leather £0.00
19"/20" 826 M Double-spoke Bicolour Black Alloy Wheels £0.00
Heated Steering Wheel £0.00
Technology Pack £0.00

Please note that these are factory fitted options which have been added to your vehicle and are included in the price.

Vehicle spec

Body Glass

  • Heated rear window with automatic switch off
  • Windscreen wipers with integrated washing jets
  • Front electric windows with open and close fingertip control, anti trap facility and comfort closing
  • Heat protection, sun protection glazing
  • Rain sensor
  • Acoustic laminated side glass
  • Heated washer jets

Brakes

  • Dynamic Stability Control with M Dynamic mode
  • ABS/EBD
  • Automatic Stability Control (ASC)
  • Cornering brake control (CBC)
  • Dynamic brake control
  • Electromechanical parking brake
  • Dynamic Traction Control - DTC
  • Hill start assist
  • Brake energy regeneration
  • Brake fade compensation
  • Dry braking
  • Compound structure brake discs
  • Electronic differential lock control (EDLC)
  • Dynamic stability control + (DSC+)

Chassis/Suspension

  • Adaptive M Sport suspension
  • M Drive Professional including track mode, laptimer, traction control & Drift analyser
  • Double joint spring strut front axle

Communication

  • Bluetooth with USB
  • Enhanced bluetooth with wireless charging

Driver Aids

  • Automatic start/stop system
  • Pull away assistant
  • Driving experience switch

Driver Convenience

  • Electric Power Steering (EPS) with Servotronic
  • Speed limiter
  • Active guard plus
  • M drive buttons
  • Variable sport steering
  • Park distance control

Driver Information

  • Head up Display
  • BMW Online services
  • BMW gesture control
  • BMW Live Cockpit Professional sat nav system with 12.3" instrument display and high resolution control display
  • Wi-Fi hotspot
  • Connected drive services
  • On board computer
  • Lights on warning
  • Service interval indicator
  • Oil temperature gauge
  • Door/boot open warning light
  • On board diagnostics
  • Outside temperature display
  • Run flat indicator
  • Brake pad wear indicator warning light
  • BMW iDrive controller on centre console
  • BMW teleservices
  • Optimum shift indicator
  • BMW legal emergency call
  • Oil sensor for level and grade, warning by check control system
  • Instrument cluster with extended contents
  • Condition based service
  • BMW ConnectedDrive online services
  • Shifting point display
  • Language version English
  • BMW Live Cockpit Pro with Head up display including 12.3" instrument display and 14.9" high resolution control display with navigation function

Driving Mirrors

  • Electric folding door mirrors
  • Auto dimming rear view mirror
  • Auto dimming driver's door mirror
  • Door mirror integrated indicators
  • Electric adjustable heated door mirrors
  • Mirror glass aspheric on driver's side, convex on passenger side

Embellishment Trims

  • High gloss black interior trim

Engine

  • Safety battery terminal clamp

Entertainment

  • USB C dual charger in rear centre console
  • BMW professional radio/CD/MP3
  • Auxiliary point for auxiliary devices
  • DAB Digital radio
  • Harman/Kardon loudspeaker system
  • 8 programmable favourite buttons
  • Wireless charging tray

Exterior Lights

  • Day time running light
  • Follow me home headlights
  • High beam assistant
  • Automatic headlights + automatic windscreen wipers
  • Dynamic brake lights
  • LED number plate light
  • Rear fog lights
  • LED tail lights with 3D L-shaped LED light design
  • BMW Individual shadowline lights
  • Third brake light
  • Reversing light
  • Headlight beam throw control

Heating/Cooling/Ventilation

  • Three zone automatic air conditioning

Interior Lights

  • Luggage compartment lighting
  • Front interior light
  • Welcome lighting
  • Front and rear door exit lights
  • Ambient Lighting
  • Interior mirror lighting
  • Front reading light

Packs

  • Connected package professional - M4
  • Additional storage compartment pack - M4
  • High gloss shadowline exterior trim pack - M4

Safety

  • Front seat side impact airbags
  • Side impact protection
  • Two tone horn
  • Seatbelt warning
  • 4 x 3 point seatbelts
  • Tyre pressure sensor
  • Warning triangle and first aid kit
  • Front and rear head airbags
  • Driver/Front Passenger airbags
  • Front seatbelt pretensioners + load limiters
  • Crash sensor
  • M Sport seat belts
  • Digital key
  • Curtain airbags

Seats

  • 40:20:40 manually split folding rear seat with two tilt positions for backrest
  • Electric front seats + driver memory
  • Heated front seats
  • 2 rear head restraints
  • Height adjustable front headrests
  • Isofix on 2nd row outer seats
  • Front seats lumbar support
  • Front isofix attachment + airbag deactivation
  • Front seat backrest width adjustment
  • Single front passenger seat
  • 40:20:40 split folding rear 2 seat bench with loading system
  • Seat occupancy detection for driver and passenger side

Security

  • Remote central locking
  • Electronic immobiliser
  • Thatcham cat 1 remote alarm
  • Vehicle Key with 4 buttons including the integrated key
  • Centre lock switch
  • Closing system with central locking

Transmission

  • M Sport differential
  • M steptronic sport transmission with drivelogic

Vanity Mirrors

  • Driver/passenger sunvisors with illuminated vanity mirrors + covers
  • Driver/passenger sunvisors with ticket holders + illuminated vanity mirrors

Wheels - Spare

  • Tyre repair kit

Videos and photos are provided by a third party and may show different specifications available. The car advertised will not necessarily have all features or options shown in the video or pictures. If you have queries about the specific features on this car, please contact us.

Car features

Exterior Body Features
Body colour door handles
Body colour bumpers
Rear reflectors
Shark fin roof aerial
Black model designation badges
Visible VIN plate
Front and rear bumper system
Black chrome exhaust tailpipes
Carbon fibre reinforced plastic (CFRP) roof
Door sill finishers with aluminium inserts
High gloss black frameless kidney grille with M badge
M designation
BMW high gloss shadow line with extended contents
Rear boot
Interior Features
12V power socket in front centre console with blanking plug
Carbon fibre centre console incl. cover for cupholders
12V socket in luggage compartment
2 x USB Type C ports for charging in rear centre console
Front door armrests
Anthracite headlining
Front door storage bins with bottle holder
Rake/reach adjustable steering wheel
Lockable/illuminated glovebox
Front/rear door armrests
2 cupholders in front centre console
Toolkit located in luggage compartment
Storage compartment in rear doors
Carbon fibre shift paddles
Galvanic finish to control surrounds
Compartment in front of cupholder
Storage tray and compartment with cover in centre console
English handbook
Footwell lighting
Carbon fibre strip in instrument panel on front passenger side
Carbon fibre decorative steering wheel finishers
Gearshift lever with embossed M badge
Battery in luggage compartment
Centre console armrest with storage compartment
2 x 12 V Power sockets (luggage compartment and front centre console)
2 x USB Type C ports for charging and data transmission in front centre console
Multifunction steering wheel
2 cupholders in rear armrest
Carbon fibre centre console incl. cover for cupholders and storage compartment
Start/stop button in blue
Illumination in armrest storage compartment

Performance

Miles per gallon 28 mpg
Engine power 510 bhp
CO2 229
Road tax £4850

Terms & Conditions: Every effort has been made to ensure the accuracy of the information shown. However, errors do sometimes occur. The detailed specification of each vehicle listed on the Vertu website is provided by "CAP". The inclusion of such data does not imply any endorsement of any of its content nor any representation as to its accuracy.

*Vehicle reviews are conducted by an independent reviewer, information, images and specifications included may not be correct. *Delivery is free for the first 30 miles and a charge of £2 per mile thereafter (*T&Cs apply)

We are currently unable to provide part exchange valuations online.

Speak to an advisor

Opening Times
Monday - Friday 8am - 9pm
Saturday 9am - 5pm
Sunday 10am - 5pm

Apologies, we are not currently processing buy online orders.

You can reserve the vehicle for £99 using the button below, or speak to our Click 2 Drive team who will assist you with your purchase.