Bristol Street Motors is now Vertu!

Still the same great team and service - online, on the phone and in our dealerships.

We no longer support this web browser. Upgrade your browser for a better experience.

Fuel type
Petrol
Transmission
Automatic
Body style
Estate
Seats
5
Road Tax
£620
Insurance

All cars are categorised into one of 50 insurance groups. The insurance group of a vehicle increases with its power. Vehicles in lower groups are cheaper to insure than those higher up. Learn more.

25E
Co2

A vehicle's CO2 emissions are calculated through a series of tests and measured in g/km. The lower the unit, the better it is for the environment, and the less road tax you will pay.

156
Fuel economy

Mpg stands for miles per gallon, and is used to show how far your car is able to travel for every gallon (or 4.55 litres) of fuel it uses. The combined WLTP fuel economy figure provides a general overview of a car's fuel consumption over a variety of speeds and road types.

mpg

Benefits of Volvo Approved Used Cars

12-month warranty, for cars less than five years old
12-month free roadside assistance
30-day / 1,500 miles exchange warranty
MOT test cover
Car Prep Icon Van Prep Icon Bike Prep Icon Car Prep Icon Van Prep Icon Bike Prep Icon
We go the extra mile
All used cars are prepared to the highest standards before reaching our forecourts.
Read more

Vehicle spec

Body Glass

  • Rear wiper
  • Front and rear electric windows
  • Rain sensor with automatic windscreen wiper activation
  • Dark tinted windows for rear door side windows and cargo compartment
  • Dark tinted windows - rear side windows and rear screen

Brakes

  • Hill start assist
  • Electronic parking brake with auto hold
  • Vehicle deceleration control with Anti-lock Brake System, Electronic Brake Distribution and Emergency Brake Assist
  • Stability and Traction Control with Spin control, Engine Drag Control and Corner Traction Control
  • Hill descent control - Off-road drive mode

Chassis/Suspension

  • Dynamic chassis

Communication

  • Bluetooth hands free telephone kit
  • E-call
  • Wireless/Inductive Mobile Phone Charging
  • Bluetooth handsfree system
  • Apple carplay (wired)
  • Android auto (Wired)

Driver Aids

  • Speed sensitive steering
  • Lane keep assist with driver alert control
  • Oncoming Lane Mitigation
  • Driver alert control
  • Driver assistance (pilot assist and adaptive cruise control)
  • 360 degree surround view parking camera with side proximity sensors
  • Intelligent speed assistance
  • Lane keeping aid
  • Front park assist
  • Front and rear parking sensors

Driver Information

  • 9" centre console portrait touch screen
  • 12.3" Progressive Driver Display
  • Driver awareness - Blind spot information system with steer assist, cross traffic alert with autobrake and rear collision warning and mitigation
  • Google automotive services - Enabled entertainment apps, navigation with google maps, voice recognition with google assistant
  • Volvo cars services with app - Driving journal, emergency and breakdown call, engine remote start, remote door locking/unlocking and vehicle dashboard

Driving Mirrors

  • Auto dimming interior mirror
  • Auto dimming feature for exterior door mirrors
  • Auto folding and heated power door mirrors

Entertainment

  • Steering wheel mounted remote controls
  • DAB Digital radio
  • Google automatic services - Nav with google maps, apple carplay/android auto, voice recognition with google assistant
  • Premium Sound by Harman Kardon, Dolby Pro Logic II Surround Sound, Dirac Unison,12 speakers/600W and subwoofer

Exterior Lights

  • Automatic headlamp levelling
  • Home safe and approach lighting
  • Puddle lights
  • Adaptive brake lights with high level LED brake lights
  • Headlight cleaning system
  • Active bending pixel LED headlights with adaptive shadow technology
  • LED front fog lights with cornering function
  • Active high beam incorporating daytime running lights

Heating/Cooling/Ventilation

  • 2-Zone electronic climate control with CleanZone air quality system and pollen filter

Interior Lights

  • Front reading light and theatre lighting
  • High level illumination - Front door pocket, front side step (under door), tailgate, instrument panel, front door inlay, rear courtesy&reading lights
  • Mid level illumination - Front footwell, luggage & glovebox compartment,front cabin courtesy & reading lights,illuminated vanity mirrors+ticket holder

Packs

  • Climate pack without heated front seats - XC40

Safety

  • First aid kit
  • Warning triangle
  • SIPS (Side Impact Protection System)
  • WHIPS whiplash protection system - front
  • Dual stage Driver/Passenger Airbags
  • Tyre pressure monitoring system
  • Passenger airbag cut-off device
  • Drivers knee airbag
  • 3x3 point rear seatbelts
  • Power child locks on rear doors
  • Road sign information display
  • Run off Road Protection
  • Run off Road Mitigation
  • Front seats SIPS airbags
  • Slippery road and hazard light alert
  • Front and outer rear seatbelt reminder and pretensioners
  • City safety with steering support with Pedestrian + cyclist + front collision warning with full auto brake and rear auto brake
  • Driver and passenger airbags
  • IC (Inflatable Curtains) - Full Length

Seats

  • Power passenger seat
  • Multi directional lumbar support for driver and passenger seat
  • Heated front seats
  • Front headrests
  • Isofix attachments on outer rear seats
  • 3 seat bench in 2nd row
  • Power driver seat with memory + exterior mirrors memory
  • Multi directional lumbar support
  • Front seat cushion extensions
  • Power folding rear headrests
  • 60/40 versatile split folding rear seat
  • Single front passenger seat

Security

  • Locking wheel nuts
  • Anti-theft alarm including immobiliser/volume sensor + level sensor
  • Key integrated remote control central locking + fuel flap with deadlocking system and auto open/close power windows
  • Keyless drive includes keyless entry and keyless start
  • 2 x Key integrated remote control central locking including with deadlocking system and auto open/close windows and sunroof

Transmission

  • Automatic transmission with start/stop and manual change functions

The specification listed for this vehicle was standard when purchased new. The actual specification may vary, please contact our sales department for more information.

Videos and photos are provided by a third party and may show different specifications available. The car advertised will not necessarily have all features or options shown in the video or pictures. If you have queries about the specific features on this car, please contact us.

Performance

Miles per gallon mpg
Engine power 163 bhp
CO2 156
Road tax £620

Location

Volvo Exeter, Waterbridge Court, Matford, Exeter, EX2 8ED

Representative Finance Example For Online Purchases

Customer deposit £99
Monthly payments £272.01
Cash Price £15,000
Amount of credit £14,901
Fees £0.00
Optional final payment £6,912
Total amount payable £20,067.48
Annual mileage 8000*
Term 48 months
Fixed rate of interest 6.15%
Representative APR (fixed) 11.70%

Terms & Conditions: Every effort has been made to ensure the accuracy of the information shown. However, errors do sometimes occur. The detailed specification of each vehicle listed on the Vertu website is provided by "CAP". The inclusion of such data does not imply any endorsement of any of its content nor any representation as to its accuracy. *Home delivery on used cars is free if you live under 30 miles from the Vertu dealership where the vehicle is purchased . Any subsequent delivery cost is calculated at an additional £2 per mile over and above 30 miles.14 day Money back guarantee: Applies to all used, ex-demonstrator and pre-registered cars. Customers can return the car to the dealership within 14 days from delivery/collection, if usage is under 500 miles, and receive a full refund (except for road fund licence which is refunded pro-rata directly by DVLA) and cancellation of any finance arranged through us, provided that it is returned in the same condition with all keys, manuals etc. The customer will be responsible for arranging return to the dealership and for any costs of doing so. If the V5 has not yet been received by the customer and cannot be returned with the car, a sum of £250 shall be retained from the refund until such time as the original V5 is provided, or the dealership is able to submit the registered keeper change online. Any part-exchange vehicles will be paid at the agreed valuation unless a return of the part-exchange vehicle is agreed. Any return of the part-exchange vehicle would be without any liability for the condition of the part-exchange. Excludes commercial vehicles and motorcycles. (*T&Cs apply)

Still Searching?

Why not browse our range of used cars!

View all used cars

We are currently unable to provide part exchange valuations online.

Speak to an advisor

Apologies, we are not currently processing buy online orders.

You can reserve the vehicle for £99 using the button below, or speak to our Click 2 Drive team who will assist you with your purchase.

Opening Times
Monday - Friday 8am - 9pm
Saturday 9am - 5pm
Sunday 10am - 5pm