BMW M3

xDrive Competition M 4dr Step Auto Petrol Saloon

Overview

Insurance group

Fuel type

Petrol

Body type

Saloon

Transmission

Automatic

Boot space

Seats

5

Colour

Metallic - Brooklyn grey

Performance

Engine power

510 bhp

Top speed

155 mph

What's Included?
  • Black Extended Merino Leather£0.00
  • 19"/20" 826 M Double-spoke Bicolour Black Alloy Wheels£0.00
  • Electric Bootlid£0.00
  • Comfort Access£0.00
  • Adaptive LED Headlights£0.00
  • High-Beam Assistant£0.00
  • Driving Assistant£0.00
  • Control D£0.00
  • Heated Steering Wheel£250.01
  • Paint: Brooklyn Grey£875.00
  • Technology Pack£2375.00

Please note that these are factory fitted options which have been added to your vehicle and are included in the price.

Interior Features
  • 2 cupholders in front centre console
  • Storage tray and compartment with cover in centre console
  • 12V power socket in front centre console with blanking plug
  • Carbon fibre centre console incl. cover for cupholders
  • 2 x USB Type C ports for charging in rear centre console
  • Anthracite headlining
Exterior Features
  • Body colour door handles
  • Carbon fibre reinforced plastic (CFRP) roof
  • Body colour bumpers
  • Rear reflectors
  • Shark fin roof aerial
  • Black model designation badges

BMW M3

xDrive Competition M 4dr Step Auto Petrol Saloon

BMW Sunderland
4.4

Every effort has been made to ensure the accuracy of the information shown. However, errors do sometimes occur. The specification of each vehicle listed on the Vertu website is provided by "CAP". Please note that the Images of each vehicle are range shots, these can include images which do not reflect the precise details of the vehicle you are looking at and are purely used for illustrative purposes. The inclusion of such data does not imply any endorsement of any of its content nor any representation as to its accuracy. We do not charge a fee for introduction to a finance provider; however we may or may not receive a commission.

*The information given about models and their specification and features applies at the time that a vehicle is listed online or when the listing has been updated. Specifications and features do change and the information is given only as a guide. It may contain errors or omissions. The actual specification of a vehicle at the time of purchase may differ from that listed above and any important feature should be clarified as part of your purchase. The information above does not constitute an offer to sell.

For full terms and conditions visit the Vertu Terms and Conditions page.