Bristol Street Motors is now Vertu!

Still the same great team and service - online, on the phone and in our dealerships.

We no longer support this web browser. Upgrade your browser for a better experience.

Fuel type
Petrol
Transmission
Manual
Body style
Hatchback
Seats
5
Road Tax
£195
Insurance

All cars are categorised into one of 50 insurance groups. The insurance group of a vehicle increases with its power. Vehicles in lower groups are cheaper to insure than those higher up. Learn more.

22E
Co2

A vehicle's CO2 emissions are calculated through a series of tests and measured in g/km. The lower the unit, the better it is for the environment, and the less road tax you will pay.

128
Fuel economy

Mpg stands for miles per gallon, and is used to show how far your car is able to travel for every gallon (or 4.55 litres) of fuel it uses. The combined WLTP fuel economy figure provides a general overview of a car's fuel consumption over a variety of speeds and road types.

46 mpg

Benefits of Honda Approved Used cars

12-month Genuine Hondacare Guarantee
12-month Hondacare Assistance
30-day, or 1,000 miles exchange policy
Honda 'Multipoint Check' to ensure high quality
Full vehicle history
Mileage certification
Large range of finance options
Car Prep Icon Van Prep Icon Bike Prep Icon Car Prep Icon Van Prep Icon Bike Prep Icon
We go the extra mile
All used cars are prepared to the highest standards before reaching our forecourts.
Read more

Key features

Air Conditioning
Climate Control
Metallic Paint
Cruise Control
Satellite Navigation
Alloy Wheels
DAB Radio
Bluetooth
Parking Sensors
Stop Start
USB
Rear Camera
Auto Lights
Electric Folding Mirrors
Lane Departure
Rain Sensors

Manager's comments

Philip Rumbles, General Manager
Philip Rumbles, General Manager,

Ford Redditch

"Bold, futuristic and packed with clever technology, this 2018 Honda Civic Sport in sleek Silver still looks like it's driven straight out of tomorrow. From a motoring journalist's viewpoint, the Civic has long been a benchmark in the family hatchback class, and this Sport model showcases exactly why. Its sharp angles, low-slung stance and distinctive design details make it instantly recognisable and refreshingly different from anything else on the road. The technology on offer is a real highlight. Built-in satellite navigation sits proudly within the centre of the dashboard, guiding you effortlessly whether you're tackling daily commutes or longer adventures. Bluetooth connectivity ensures you stay connected at all times, allowing hands-free calls and audio streaming with ease. It's intuitive, responsive and designed to make every journey smoother and more enjoyable. Practical technology continues with the rear view camera, transforming parking and low-speed manoeuvres into a simple, stress-free experience. Whether reversing into a tight space or navigating busy car parks, visibility and confidence are always on your side. Powerfold door mirrors add another layer of convenience, automatically tucking away to protect them in narrow streets or tight parking bays, while also reinforcing the Civic's premium feel. On the road, the Civic Sport feels composed, refined and engaging. The cabin is well laid out and driver focused, with a sporty yet comfortable atmosphere that makes every drive feel purposeful. Honda's reputation for reliability and engineering excellence shines through, giving reassurance mile after mile. Buying from Vertu Ford Redditch adds even greater peace of mind. With unrivalled aftersales care and a dedicated team committed to customer satisfaction, you can enjoy complete confidence long after you drive away. This 2018 Honda Civic Sport blends striking design, clever technology and everyday usability into one genuinely exciting and dependable package."

Vehicle spec

Body Glass

  • Remote window closing
  • Rear wiper
  • Electric front/rear windows/one touch operation
  • Privacy glass
  • Automatic rain sensing wipers
  • Black window surrounds

Brakes

  • ABS+EBD+Brake assist
  • Hill start assist
  • Electronic parking brake with auto hold
  • Collision mitigation braking system
  • Emergency stop signalling system

Chassis/Suspension

  • Vehicle stability assist

Communication

  • Bluetooth hands free telephone connection
  • Apple car play/Android Auto

Driver Aids

  • Electric power steering
  • Speed limiter
  • Adaptive cruise control
  • Rear parking camera
  • Lane departure warning system
  • Lane keep assist
  • Front and rear parking sensors
  • Forward collision warning
  • Traffic sign recognition

Driver Convenience

  • Easy fuel capless refuelling system

Driver Information

  • Colour driver's information system display
  • Red instrument illumination
  • 7" touch screen

Driving Mirrors

  • Remote control door mirrors
  • Automatic retractable door mirrors
  • Power foldback door mirrors
  • Electric adjustable heated door mirrors
  • Body colour door mirrors

Entertainment

  • Connect with Garmin sat nav, touch screen, internet radio/MP3/CD, Aha app, internet
  • 8 speakers
  • Digital Audio Broadcast (DAB) Tuner
  • Steering wheel mounted audio controls
  • Auxiliary socket for external MP3 player
  • 2x USB and HDMI
  • 'Shark fin' mobile antenna

Exterior Lights

  • LED fog lights
  • Headlight washers
  • Automatic coming/leaving home lighting function
  • Automatic headlights with dusk sensor
  • LED daytime running lights
  • LED headlights
  • High beam assist

Heating/Cooling/Ventilation

  • Dual climate control air conditioning system

Interior Lights

  • Boot light
  • Ambient Lighting
  • Front/rear courtesy lights
  • Front map lights
  • Glovebox light

Safety

  • Dual front SRS airbags
  • Front seatbelt pretensioners
  • 5 three point seatbelts
  • Front side airbags
  • Passenger airbag deactivate switch
  • Front and rear curtain airbags
  • Tyre pressure warning
  • Anti-whiplash front headrests
  • Deflation detection system

Seats

  • Driver's electric lumbar adjustment
  • Passenger seat back pocket
  • Three height adjustable rear head restraints
  • Driver's seat height adjustment
  • Isofix system on outer rear seats

Security

  • ECU immobiliser
  • Remote central locking with 2 remote folding keys
  • Ultrasonic alarm
  • Honda super locks

Vanity Mirrors

  • Sunvisors with illuminated vanity mirrors

Wheels - Spare

  • Tyre repair kit

The specification listed for this vehicle was standard when purchased new. The actual specification may vary, please contact our sales department for more information.

Videos and photos are provided by a third party and may show different specifications available. The car advertised will not necessarily have all features or options shown in the video or pictures. If you have queries about the specific features on this car, please contact us.

Performance

Miles per gallon 46 mpg
Engine power 182 bhp
CO2 128
Road tax £195

Location

Ford Redditch, Battens Drive, Redditch, Worcestershire , B98 0LJ

Representative Finance Example For Online Purchases

Customer deposit £99
Monthly payments £272.01
Cash Price £15,000
Amount of credit £14,901
Fees £0.00
Optional final payment £6,912
Total amount payable £20,067.48
Annual mileage 8000*
Term 48 months
Fixed rate of interest 6.15%
Representative APR (fixed) 11.70%

Terms & Conditions: Every effort has been made to ensure the accuracy of the information shown. However, errors do sometimes occur. The detailed specification of each vehicle listed on the Vertu website is provided by "CAP". The inclusion of such data does not imply any endorsement of any of its content nor any representation as to its accuracy. *Home delivery on used cars is free if you live under 30 miles from the Vertu dealership where the vehicle is purchased . Any subsequent delivery cost is calculated at an additional £2 per mile over and above 30 miles.14 day Money back guarantee: Applies to all used, ex-demonstrator and pre-registered cars. Customers can return the car to the dealership within 14 days from delivery/collection, if usage is under 500 miles, and receive a full refund (except for road fund licence which is refunded pro-rata directly by DVLA) and cancellation of any finance arranged through us, provided that it is returned in the same condition with all keys, manuals etc. The customer will be responsible for arranging return to the dealership and for any costs of doing so. If the V5 has not yet been received by the customer and cannot be returned with the car, a sum of £250 shall be retained from the refund until such time as the original V5 is provided, or the dealership is able to submit the registered keeper change online. Any part-exchange vehicles will be paid at the agreed valuation unless a return of the part-exchange vehicle is agreed. Any return of the part-exchange vehicle would be without any liability for the condition of the part-exchange. Excludes commercial vehicles and motorcycles. (*T&Cs apply)

Still Searching?

Why not browse our range of used cars!

View all used cars

We are currently unable to provide part exchange valuations online.

Speak to an advisor

Apologies, we are not currently processing buy online orders.

You can reserve the vehicle for £99 using the button below, or speak to our Click 2 Drive team who will assist you with your purchase.

Opening Times
Monday - Friday 8am - 9pm
Saturday 9am - 5pm
Sunday 10am - 5pm