Bristol Street Motors is now Vertu!

Still the same great team and service - online, on the phone and in our dealerships.

We no longer support this web browser. Upgrade your browser for a better experience.

Fuel type
Petrol
Transmission
Automatic
Body style
Saloon
Seats
5
Road Tax
£4850
Insurance

All cars are categorised into one of 50 insurance groups. The insurance group of a vehicle increases with its power. Vehicles in lower groups are cheaper to insure than those higher up. Learn more.

42E
Co2

A vehicle's CO2 emissions are calculated through a series of tests and measured in g/km. The lower the unit, the better it is for the environment, and the less road tax you will pay.

229
Fuel economy

Mpg stands for miles per gallon, and is used to show how far your car is able to travel for every gallon (or 4.55 litres) of fuel it uses. The combined WLTP fuel economy figure provides a general overview of a car's fuel consumption over a variety of speeds and road types.

28 mpg

What's included?

19"/20" 826 M Double-spoke Bicolour Black Alloy Wheels £0.00
Heated Steering Wheel £0.00
Comfort Access £0.00
M Brakes with Red Calipers £324.46
BMW Individual Lights Shadow Line £0.00
Electric Bootlid £0.00
Adaptive LED Headlights £0.00
High-Beam Assistant £0.00
Driving Assistant £0.00
Parking Assistant Plus £0.00
M Carbon Exterior Styling £0.00
BMW Individual Paint £4384.99
Fiona Red / Black Extended Merino Leather £600.00
Control D £0.00
Ultimate Pack £7825.01

Please note that these are factory fitted options which have been added to your vehicle and are included in the price.

Vehicle spec

Body Glass

  • Windscreen wipers with integrated washing jets
  • Electric front and rear windows with one touch/convenient open/close function
  • Heated rear window with automatic switch off
  • Acoustic glazing
  • Heat protection, sun protection glazing
  • Heated washer jets

Brakes

  • ABS/EBD
  • Automatic Stability Control (ASC)
  • Cornering brake control (CBC)
  • Dynamic brake control
  • Electromechanical parking brake
  • Dynamic Traction Control - DTC
  • Hill start assist
  • Dynamic Stability Control with M Dynamic mode
  • Brake energy regeneration
  • Brake fade compensation
  • Dry braking
  • Compound structure brake discs
  • Electronic differential lock control (EDLC)

Chassis/Suspension

  • Adaptive M Sport suspension
  • M Drive Professional including track mode, laptimer, traction control & Drift analyser
  • Double joint spring strut front axle

Communication

  • Bluetooth with USB
  • Enhanced bluetooth with wireless charging
  • Bluetooth functionality with Apple CarPlay/Android Auto

Driver Aids

  • Automatic start/stop system
  • Pull away assistant
  • Driving experience switch
  • Illuminated control elements

Driver Convenience

  • Electric Power Steering (EPS) with Servotronic
  • Speed limiter
  • Active guard plus
  • M drive buttons
  • Variable sport steering

Driver Information

  • BMW gesture control
  • Wi-Fi hotspot
  • Connected drive services
  • On board computer
  • Lights on warning
  • Service interval indicator
  • Oil temperature gauge
  • Door/boot open warning light
  • On board diagnostics
  • Head up Display
  • Outside temperature display
  • BMW Online services
  • Run flat indicator
  • Brake pad wear indicator warning light
  • BMW iDrive controller on centre console
  • BMW teleservices
  • Optimum shift indicator
  • BMW legal emergency call
  • Oil sensor for level and grade, warning by check control system
  • BMW Live Cockpit Professional sat nav system with 12.3" instrument display and high resolution control display
  • Instrument cluster with extended contents
  • Condition based service
  • Widescreen display
  • Shifting point display
  • BMW ConnectedDrive online services

Driving Mirrors

  • Electric folding door mirrors
  • Auto dimming rear view mirror
  • Auto dimming driver's door mirror
  • Door mirror integrated indicators
  • Electric adjustable heated door mirrors
  • Mirror glass aspheric on driver's side, convex on passenger side
  • Automatic parking function on front passenger's exterior mirror

Embellishment Trims

  • High gloss black interior trim

Engine

  • Safety battery terminal clamp

Entertainment

  • BMW professional radio/CD/MP3
  • Auxiliary point for auxiliary devices
  • DAB Digital radio
  • Harman/Kardon loudspeaker system
  • 8 programmable favourite buttons
  • Wireless charging tray

Exterior Lights

  • Day time running light
  • Follow me home headlights
  • High beam assistant
  • Automatic headlights + automatic windscreen wipers
  • Dynamic brake lights
  • LED number plate light
  • Rear fog lights
  • LED tail lights with 3D L-shaped LED light design
  • BMW Individual shadowline lights
  • 3rd brake light
  • Reversing light
  • Headlight beam throw control
  • Ambient lighting in door panels

Heating/Cooling/Ventilation

  • Three zone automatic air conditioning

Interior Lights

  • Ambient Lighting
  • Front and rear ambient footwell lighting
  • Luggage compartment lighting
  • Front interior light
  • Welcome lighting
  • Front and rear door exit lights
  • Interior mirror lighting
  • Ambient lighting front and rear
  • Dynamic ambient interior lighting
  • Ambient inside door handle light

Packs

  • High gloss shadowline exterior trim pack - M4
  • Connected package professional - M3
  • Ultimate pack - M3
  • Additional storage compartment pack - M3
  • High gloss shadowline exterior trim pack - M3

Safety

  • Front seat side impact airbags
  • Side impact protection
  • Two tone horn
  • Seatbelt warning
  • 3 point seatbelts on all seats
  • Tyre pressure sensor
  • Warning triangle and first aid kit
  • Rear child proof door locks
  • Front and rear head airbags
  • Driver/Front Passenger airbags
  • Front seatbelt pretensioners + load limiters
  • Crash sensor
  • M Sport seat belts
  • Digital key

Seats

  • 40:20:40 manually split folding rear seat with two tilt positions for backrest
  • Electric front seats + driver memory
  • Heated front seats
  • Height adjustable front headrests
  • Isofix on 2nd row outer seats
  • 3 folding rear headrests
  • Front seats lumbar support
  • Front isofix attachment + airbag deactivation
  • Front seat backrest width adjustment
  • 3 seat bench in 2nd row
  • Single front passenger seat
  • Manual 40:20:40 split folding rear seat with two tilt positions for backrest
  • Seat occupancy detection for driver and passenger side

Security

  • Remote central locking
  • Electronic immobiliser
  • Thatcham cat 1 remote alarm
  • Vehicle Key with 4 buttons including the integrated key
  • Centre lock switch
  • Closing system with central locking

Transmission

  • M Sport differential
  • M steptronic sport transmission with drivelogic

Vanity Mirrors

  • Driver/passenger sunvisors with illuminated vanity mirrors + covers

Wheels - Spare

  • Tyre repair kit

Videos and photos are provided by a third party and may show different specifications available. The car advertised will not necessarily have all features or options shown in the video or pictures. If you have queries about the specific features on this car, please contact us.

Car features

Exterior Body Features
Body colour door handles
Carbon fibre reinforced plastic (CFRP) roof
Body colour bumpers
Rear reflectors
Shark fin roof aerial
Black model designation badges
Visible VIN plate
Front and rear bumper system
Black chrome exhaust tailpipes
Door sill finishers with aluminium inserts
High gloss black frameless kidney grille with M badge
M designation
BMW high gloss shadow line with extended contents
Rear side wing doors
Rear boot
BMW emblem on engine compartment lid and tailgate
Front and rear apron plastic in body colour
Rear right M3 competition inscription
Strakes in front side panel, black matt/black high-gloss, with model badge
M Sport entry door sill strips
Carbon fibre reinforced plastic (CFRP) roof with high gloss black roof aerial bulge and roof mouldings
High gloss black lower bumper edges, side sills and diffuser edge binding
Illuminated bow type door handles in body colour drivers side with door lock
Interior Features
2 cupholders in front centre console
Storage tray and compartment with cover in centre console
12V power socket in front centre console with blanking plug
Carbon fibre centre console incl. cover for cupholders
2 x USB Type C ports for charging in rear centre console
Anthracite headlining
Front door storage bins with bottle holder
Rake/reach adjustable steering wheel
Lockable/illuminated glovebox
Front/rear door armrests
Toolkit located in luggage compartment
Storage compartment in rear doors
Carbon fibre shift paddles
Galvanic finish to control surrounds
Compartment in front of cupholder
English handbook
Through loading system
Footwell lighting
Carbon fibre strip in instrument panel on front passenger side
Carbon fibre decorative steering wheel finishers
Gearshift lever with embossed M badge
Battery in luggage compartment
2 x 12 V Power sockets (luggage compartment and front centre console)
2 x USB Type C ports for charging and data transmission in front centre console
Centre console armrest with storage compartment
Multifunction steering wheel
Folding rear centre armrest with 2 cupholders
2 front cupholder in centre console with clamping elements and matt black inlay
Ambient lighting for storage compartment
Ambient lighting for instrument panel
Carbon fibre centre console incl. cover for cupholders and storage compartment

Performance

Miles per gallon 28 mpg
Engine power 510 bhp
CO2 229
Road tax £4850

Terms & Conditions: Every effort has been made to ensure the accuracy of the information shown. However, errors do sometimes occur. The detailed specification of each vehicle listed on the Vertu website is provided by "CAP". The inclusion of such data does not imply any endorsement of any of its content nor any representation as to its accuracy.

*Vehicle reviews are conducted by an independent reviewer, information, images and specifications included may not be correct. *Delivery is free for the first 30 miles and a charge of £2 per mile thereafter (*T&Cs apply)

We are currently unable to provide part exchange valuations online.

Speak to an advisor

Opening Times
Monday - Friday 8am - 9pm
Saturday 9am - 5pm
Sunday 10am - 5pm

Apologies, we are not currently processing buy online orders.

You can reserve the vehicle for £99 using the button below, or speak to our Click 2 Drive team who will assist you with your purchase.